şarjnekadar

Home › Electric cars › Jeep

Jeep electric models

The 2 electric Jeep models sold in Türkiye: battery, range, peak DC charging power and the cost of a full charge from empty at home (4.97 TL/kWh).

ModelYearBatteryRangeDCFull charge at home
Avenger 1st Edition202350.8 kWh295 km100 kW274 TL
Avenger Electric 1st Edition202350.8 kWh310 km100 kW274 TL

Running cost of Jeep cars

At home, 100 km89 TL–93 TL
At Sharz.net DC, 100 km188 TL–197 TL
Petrol car, 100 km578 TL
10→80% DC charge at a 150 kW station22 min–24 min

Charging at home makes 100 km in a Jeep at least 83% cheaper than in a petrol car. Fast charging costs more than home charging, but even at the cheapest DC network the cost of the road stays below petrol.

Jeep models in numbers

Battery capacity runs 50.8 kWh and the calculated range is 295 km–310 km. The longest range: Avenger Electric 1st Edition (310 km). The lowest average consumption is the Avenger Electric 1st Edition's (16.4 kWh/100 km), the highest the Avenger 1st Edition's (17.2 kWh/100 km).

ModelBatteryConsumption /100 kmRangePeak DC
Avenger 1st Edition50.8 kWh17.2 kWh295 km100 kW
Avenger Electric 1st Edition50.8 kWh16.4 kWh310 km100 kW

Jeep charging time and cost per 100 km

A 10% to 80% charge takes 22 min–24 min at a 150 kW charger and 43 min at a 50 kW one. The quickest is the Avenger 1st Edition (22 min), the slowest the Avenger Electric 1st Edition (24 min). 100 km costs 89 TL–93 TL at home (4.97 TL/kWh) and 240 TL–251 TL at the median public DC price (13.44 TL/kWh across 20 networks); in a petrol car it is 578 TL.

Model10→80%, 150 kW10→80%, 50 kW100 km at home100 km DC (median)
Avenger 1st Edition22 min43 min93 TL251 TL
Avenger Electric 1st Edition24 min43 min89 TL240 TL

Times come from the published charging curve for 2 models. A car uses the lower of the charger's power and its own peak DC power.

Which charging networks suit Jeep cars

Because Jeep cars can make use of 100 kW and more, the networks are ranked by their number of DC stations of at least 100 kW. The counts are for the whole country; use the route planner for the stations on your own route.

Network100 kW+ stationsDC price
Trugo1,05314.98 TL/kWh
Eşarj46613.50 TL/kWh
WAT Mobilite33814.49 TL/kWh
ZES31712.99 TL/kWh
Otopriz29613.90 TL/kWh

Range is battery capacity divided by average consumption; it changes with speed, temperature and road.

Frequently asked questions

What is the range of Jeep electric cars?

The longest range is the Jeep Avenger Electric 1st Edition's, about 310 km. Range is battery capacity divided by average consumption; it is shorter at motorway speed and in the cold.

How much does it cost to charge a Jeep at home?

At 4.97 TL/kWh, a full charge from empty costs 274 TL. At public DC chargers the price per kWh depends on the network; the cheapest DC charging is currently Sharz.net's, 10.55 TL.

How fast do Jeep electric cars DC charge?

The highest DC charging power is the Jeep Avenger 1st Edition's, 100 kW. Actual speed drops as the battery fills and depends on the charger's power.

How long does a Jeep take to charge from 10% to 80%?

22 min–24 min at a 150 kW charger and 43 min at a 50 kW one. The quickest is the Avenger 1st Edition, at 22 min.

What does 100 km in a Jeep cost?

89 TL–93 TL at home and 240 TL–251 TL at the median public DC price. The same distance in a petrol car costs 578 TL.

Which charging network suits Jeep cars best?

By number of DC stations of 100 kW or more, the top three networks are Trugo (1,053), Eşarj (466), WAT Mobilite (338). The counts are national; check the planner for the stations on your route.

Which Jeep uses the least energy?

The Avenger Electric 1st Edition, at 16.4 kWh per 100 km; the thirstiest is the Avenger 1st Edition, at 17.2 kWh.