Home › Electric cars › Mini › Cooper SE (2020)
Mini Cooper SE (2020) charging cost and time
The Mini Cooper SE (2020) goes about 180 km on its 28.9 kWh battery. A full charge from empty costs 156 TL at home; 10% to 80% at the cheapest DC network costs 232 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 156 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 232 TL | 184 TL | |
| 257 TL | — | |
| 264 TL | 198 TL | |
| 264 TL | 209 TL | |
| 273 TL | 242 TL | |
| 281 TL | 220 TL | |
| 284 TL | 218 TL | |
| 286 TL | 229 TL |
Cost per 100 km
| Charging at home | 86.98 TL |
| DC station, Sharz.net | 185 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 25 min |
Other Mini models
- Aceman E
- Aceman JCW
- Aceman SE
- Cooper E
- Cooper JCW
- Cooper SE (2024)
- Cooper SE Convertible
- Countryman E
- Countryman SE ALL4
Frequently asked questions
How much does a full charge of the Mini Cooper SE (2020) cost?
On the residential tariff, a full charge from empty costs about 156 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 232 TL.
How long does the Mini Cooper SE (2020) take to charge?
10% to 80% takes about 25 min at a 50 kW charger. The car accepts up to 50 kW DC, and the times come from its charging curve.
What does the Mini Cooper SE (2020) cost per 100 km?
Charged at home, 100 km costs about 86.98 TL; at a DC station, 185 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Mini Cooper SE (2020)?
About 180 km from its 28.9 kWh battery at an average 16.1 kWh/100 km; less at motorway speed and in the cold.