Home › Electric cars › Peugeot › e-Partner 50 kWh
Peugeot e-Partner 50 kWh charging cost and time
The Peugeot e-Partner 50 kWh goes about 200 km on its 45.0 kWh battery. A full charge from empty costs 243 TL at home; 10% to 80% at the cheapest DC network costs 361 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 243 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 361 TL | 286 TL | |
| 401 TL | — | |
| 411 TL | 308 TL | |
| 411 TL | 325 TL | |
| 425 TL | 376 TL | |
| 438 TL | 342 TL | |
| 442 TL | 339 TL | |
| 445 TL | 356 TL |
Cost per 100 km
| Charging at home | 122 TL |
| DC station, Sharz.net | 258 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 38 min |
| 150 kW charger | 26 min |
Other Peugeot models
- e-2008 11 kW-AC
- e-2008 50 kWh
- e-2008 54 kWh
- e-2008 7,2 kW-AC
- e-2008 SUV
- e-208 11 kW-AC
- e-208 51 kWh
- e-208 54 kWh
- e-208 7,2 kW-AC
- e-3008 73 kWh
- e-3008 73 kWh Dual Motor
- e-3008 97 kWh Long Range
Frequently asked questions
How much does a full charge of the Peugeot e-Partner 50 kWh cost?
On the residential tariff, a full charge from empty costs about 243 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 361 TL.
How long does the Peugeot e-Partner 50 kWh take to charge?
10% to 80% takes about 38 min at a 50 kW charger, 26 min at a 150 kW charger. The car accepts up to 100 kW DC, and the times come from its charging curve.
What does the Peugeot e-Partner 50 kWh cost per 100 km?
Charged at home, 100 km costs about 122 TL; at a DC station, 258 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Peugeot e-Partner 50 kWh?
About 200 km from its 45.0 kWh battery at an average 22.5 kWh/100 km; less at motorway speed and in the cold.