şarjnekadar

HomeElectric carsPolestar › 3 Long Range Single Motor

Polestar 3 Long Range Single Motor charging cost and time

The Polestar 3 Long Range Single Motor goes about 500 km on its 107.0 kWh battery. A full charge from empty costs 578 TL at home; 10% to 80% at the cheapest DC network costs 859 TL.

107.0 kWhBattery
~500 kmRange
250 kWPeak DC
21 min10→80%, 300 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 578 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net859 TL680 TL
Tesla Supercharger953 TL
Petrol Ofisi e-POwer976 TL732 TL
Otowatt976 TL773 TL
Otojet1,010 TL895 TL
CV Charging1,041 TL813 TL
Voltrun1,050 TL806 TL
Aksa Şarj1,058 TL847 TL

Cost per 100 km

Charging at home116 TL
DC station, Sharz.net245 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger1 h 30 min
150 kW charger30 min
300 kW charger21 min
Plan your route with the 3 Long Range Single Motor

Other Polestar models

All Polestar models

Frequently asked questions

How much does a full charge of the Polestar 3 Long Range Single Motor cost?

On the residential tariff, a full charge from empty costs about 578 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 859 TL.

How long does the Polestar 3 Long Range Single Motor take to charge?

10% to 80% takes about 1 h 30 min at a 50 kW charger, 30 min at a 150 kW charger, 21 min at a 300 kW charger. The car accepts up to 250 kW DC, and the times come from its charging curve.

What does the Polestar 3 Long Range Single Motor cost per 100 km?

Charged at home, 100 km costs about 116 TL; at a DC station, 245 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Polestar 3 Long Range Single Motor?

About 500 km from its 107.0 kWh battery at an average 21.4 kWh/100 km; less at motorway speed and in the cold.