şarjnekadar

HomeElectric carsSkoda › CITIGOe iV

Skoda CITIGOe iV charging cost and time

The Skoda CITIGOe iV goes about 204 km on its 32.3 kWh battery. A full charge from empty costs 174 TL at home; 10% to 80% at the cheapest DC network costs 259 TL.

32.3 kWhBattery
~204 kmRange
37 kWPeak DC
41 min10→80%, 50 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 174 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net259 TL205 TL
Tesla Supercharger288 TL
Petrol Ofisi e-POwer295 TL221 TL
Otowatt295 TL233 TL
Otojet305 TL270 TL
CV Charging314 TL246 TL
Voltrun317 TL243 TL
Aksa Şarj319 TL256 TL

Cost per 100 km

Charging at home85.35 TL
DC station, Sharz.net181 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger41 min
Plan your route with the CITIGOe iV

Other Skoda models

All Skoda models

Frequently asked questions

How much does a full charge of the Skoda CITIGOe iV cost?

On the residential tariff, a full charge from empty costs about 174 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 259 TL.

How long does the Skoda CITIGOe iV take to charge?

10% to 80% takes about 41 min at a 50 kW charger. The car accepts up to 37 kW DC, and the times come from its charging curve.

What does the Skoda CITIGOe iV cost per 100 km?

Charged at home, 100 km costs about 85.35 TL; at a DC station, 181 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Skoda CITIGOe iV?

About 204 km from its 32.3 kWh battery at an average 15.8 kWh/100 km; less at motorway speed and in the cold.