Home › Electric cars › smart › #1 Pure+
smart #1 Pure+ charging cost and time
The smart #1 Pure+ goes about 337 km on its 62.0 kWh battery. A full charge from empty costs 335 TL at home; 10% to 80% at the cheapest DC network costs 498 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 335 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 498 TL | 394 TL | |
| 552 TL | — | |
| 566 TL | 424 TL | |
| 566 TL | 448 TL | |
| 585 TL | 518 TL | |
| 603 TL | 471 TL | |
| 609 TL | 467 TL | |
| 613 TL | 491 TL |
Cost per 100 km
| Charging at home | 99.40 TL |
| DC station, Sharz.net | 211 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 52 min |
| 150 kW charger | 18 min |
Other smart models
Frequently asked questions
How much does a full charge of the smart #1 Pure+ cost?
On the residential tariff, a full charge from empty costs about 335 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 498 TL.
How long does the smart #1 Pure+ take to charge?
10% to 80% takes about 52 min at a 50 kW charger, 18 min at a 150 kW charger. The car accepts up to 150 kW DC, and the times come from its charging curve.
What does the smart #1 Pure+ cost per 100 km?
Charged at home, 100 km costs about 99.40 TL; at a DC station, 211 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the smart #1 Pure+?
About 337 km from its 62.0 kWh battery at an average 18.4 kWh/100 km; less at motorway speed and in the cold.