Home › Electric cars › DS › 3 Crossback E-Tense 7,2 kW-AC
DS 3 Crossback E-Tense 7,2 kW-AC charging cost and time
The DS 3 Crossback E-Tense 7,2 kW-AC goes about 250 km on its 46.0 kWh battery. A full charge from empty costs 249 TL at home; 10% to 80% at the cheapest DC network costs 369 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 249 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 369 TL | 292 TL | |
| 410 TL | — | |
| 420 TL | 315 TL | |
| 420 TL | 332 TL | |
| 434 TL | 385 TL | |
| 448 TL | 350 TL | |
| 452 TL | 347 TL | |
| 455 TL | 364 TL |
Cost per 100 km
| Charging at home | 99.40 TL |
| DC station, Sharz.net | 211 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 39 min |
| 150 kW charger | 20 min |
Other DS models
Frequently asked questions
How much does a full charge of the DS 3 Crossback E-Tense 7,2 kW-AC cost?
On the residential tariff, a full charge from empty costs about 249 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 369 TL.
How long does the DS 3 Crossback E-Tense 7,2 kW-AC take to charge?
10% to 80% takes about 39 min at a 50 kW charger, 20 min at a 150 kW charger. The car accepts up to 100 kW DC, and the times come from its charging curve.
What does the DS 3 Crossback E-Tense 7,2 kW-AC cost per 100 km?
Charged at home, 100 km costs about 99.40 TL; at a DC station, 211 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the DS 3 Crossback E-Tense 7,2 kW-AC?
About 250 km from its 46.0 kWh battery at an average 18.4 kWh/100 km; less at motorway speed and in the cold.