Home › Electric cars › DS › N°8 FWD Long Range
DS N°8 FWD Long Range charging cost and time
The DS N°8 FWD Long Range goes about 555 km on its 97.2 kWh battery. A full charge from empty costs 525 TL at home; 10% to 80% at the cheapest DC network costs 780 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 525 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 780 TL | 618 TL | |
| 865 TL | — | |
| 887 TL | 665 TL | |
| 887 TL | 702 TL | |
| 917 TL | 813 TL | |
| 946 TL | 739 TL | |
| 954 TL | 732 TL | |
| 961 TL | 769 TL |
Cost per 100 km
| Charging at home | 94.54 TL |
| DC station, Sharz.net | 201 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 1 h 22 min |
| 150 kW charger | 28 min |
| 300 kW charger | 24 min |
Other DS models
- 3 Crossback E-Tense
- 3 Crossback E-Tense 11 kW-AC
- 3 Crossback E-Tense 7,2 kW-AC
- 3 E-Tense
- N°8 AWD Long Range
- N°8 FWD
Frequently asked questions
How much does a full charge of the DS N°8 FWD Long Range cost?
On the residential tariff, a full charge from empty costs about 525 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 780 TL.
How long does the DS N°8 FWD Long Range take to charge?
10% to 80% takes about 1 h 22 min at a 50 kW charger, 28 min at a 150 kW charger, 24 min at a 300 kW charger. The car accepts up to 200 kW DC, and the times come from its charging curve.
What does the DS N°8 FWD Long Range cost per 100 km?
Charged at home, 100 km costs about 94.54 TL; at a DC station, 201 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the DS N°8 FWD Long Range?
About 555 km from its 97.2 kWh battery at an average 17.5 kWh/100 km; less at motorway speed and in the cold.