Home › Electric cars › Leapmotor › B10 67.1 kWh
Leapmotor B10 67.1 kWh charging cost and time
The Leapmotor B10 67.1 kWh goes about 376 km on its 65.0 kWh battery. A full charge from empty costs 351 TL at home; 10% to 80% at the cheapest DC network costs 522 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 351 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 522 TL | 413 TL | |
| 579 TL | — | |
| 593 TL | 445 TL | |
| 593 TL | 469 TL | |
| 613 TL | 544 TL | |
| 633 TL | 494 TL | |
| 638 TL | 490 TL | |
| 642 TL | 514 TL |
Cost per 100 km
| Charging at home | 93.46 TL |
| DC station, Sharz.net | 198 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power (estimated at 80% of peak power, as no charging curve is published):
| 50 kW charger | 1 h 8 min |
| 150 kW charger | 23 min |
Other Leapmotor models
Frequently asked questions
How much does a full charge of the Leapmotor B10 67.1 kWh cost?
On the residential tariff, a full charge from empty costs about 351 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 522 TL.
How long does the Leapmotor B10 67.1 kWh take to charge?
10% to 80% takes about 1 h 8 min at a 50 kW charger, 23 min at a 150 kW charger. The car accepts up to 168 kW DC.
What does the Leapmotor B10 67.1 kWh cost per 100 km?
Charged at home, 100 km costs about 93.46 TL; at a DC station, 198 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Leapmotor B10 67.1 kWh?
About 376 km from its 65.0 kWh battery at an average 17.3 kWh/100 km; less at motorway speed and in the cold.