şarjnekadar

HomeElectric carsLeapmotor › B10 67.1 kWh

Leapmotor B10 67.1 kWh charging cost and time

The Leapmotor B10 67.1 kWh goes about 376 km on its 65.0 kWh battery. A full charge from empty costs 351 TL at home; 10% to 80% at the cheapest DC network costs 522 TL.

65.0 kWhBattery
~376 kmRange
168 kWPeak DC
23 min10→80%, 150 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 351 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net522 TL413 TL
Tesla Supercharger579 TL
Petrol Ofisi e-POwer593 TL445 TL
Otowatt593 TL469 TL
Otojet613 TL544 TL
CV Charging633 TL494 TL
Voltrun638 TL490 TL
Aksa Şarj642 TL514 TL

Cost per 100 km

Charging at home93.46 TL
DC station, Sharz.net198 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power (estimated at 80% of peak power, as no charging curve is published):

50 kW charger1 h 8 min
150 kW charger23 min
Plan your route with the B10 67.1 kWh

Other Leapmotor models

All Leapmotor models

Frequently asked questions

How much does a full charge of the Leapmotor B10 67.1 kWh cost?

On the residential tariff, a full charge from empty costs about 351 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 522 TL.

How long does the Leapmotor B10 67.1 kWh take to charge?

10% to 80% takes about 1 h 8 min at a 50 kW charger, 23 min at a 150 kW charger. The car accepts up to 168 kW DC.

What does the Leapmotor B10 67.1 kWh cost per 100 km?

Charged at home, 100 km costs about 93.46 TL; at a DC station, 198 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Leapmotor B10 67.1 kWh?

About 376 km from its 65.0 kWh battery at an average 17.3 kWh/100 km; less at motorway speed and in the cold.