Home › Electric cars › Leapmotor › C10
Leapmotor C10 charging cost and time
The Leapmotor C10 goes about 355 km on its 69.9 kWh battery. A full charge from empty costs 378 TL at home; 10% to 80% at the cheapest DC network costs 561 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 378 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 561 TL | 444 TL | |
| 622 TL | — | |
| 638 TL | 478 TL | |
| 638 TL | 505 TL | |
| 659 TL | 585 TL | |
| 680 TL | 531 TL | |
| 686 TL | 527 TL | |
| 691 TL | 553 TL |
Cost per 100 km
| Charging at home | 106 TL |
| DC station, Sharz.net | 226 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 59 min |
Other Leapmotor models
Frequently asked questions
How much does a full charge of the Leapmotor C10 cost?
On the residential tariff, a full charge from empty costs about 378 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 561 TL.
How long does the Leapmotor C10 take to charge?
10% to 80% takes about 59 min at a 50 kW charger. The car accepts up to 84 kW DC, and the times come from its charging curve.
What does the Leapmotor C10 cost per 100 km?
Charged at home, 100 km costs about 106 TL; at a DC station, 226 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Leapmotor C10?
About 355 km from its 69.9 kWh battery at an average 19.7 kWh/100 km; less at motorway speed and in the cold.