Home › Electric cars › Tesla › Model 3 SR+
Tesla Model 3 SR+ charging cost and time
The Tesla Model 3 SR+ goes about 327 km on its 50.0 kWh battery. A full charge from empty costs 270 TL at home; 10% to 80% at the cheapest DC network costs 401 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 270 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 401 TL | 318 TL | |
| 445 TL | — | |
| 456 TL | 342 TL | |
| 456 TL | 361 TL | |
| 472 TL | 418 TL | |
| 487 TL | 380 TL | |
| 491 TL | 377 TL | |
| 494 TL | 396 TL |
Cost per 100 km
| Charging at home | 82.65 TL |
| DC station, Sharz.net | 175 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 42 min |
| 150 kW charger | 18 min |
Other Tesla models
- Model 3 Long Range Dual Motor
- Model 3 Long Range Performance
- Model 3 Long Range RWD
- Model 3 LR
- Model 3 Performance (2020)
- Model 3 Performance (2021)
- Model 3 RWD (2022)
- Model 3 RWD (2025)
- Model 3 Standard Range Plus
- Model 3 Standard Range Plus LFP
- Model S Dual Motor
- Model S Long Range
Frequently asked questions
How much does a full charge of the Tesla Model 3 SR+ cost?
On the residential tariff, a full charge from empty costs about 270 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 401 TL.
How long does the Tesla Model 3 SR+ take to charge?
10% to 80% takes about 42 min at a 50 kW charger, 18 min at a 150 kW charger. The car accepts up to 149 kW DC, and the times come from its charging curve.
What does the Tesla Model 3 SR+ cost per 100 km?
Charged at home, 100 km costs about 82.65 TL; at a DC station, 175 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Tesla Model 3 SR+?
About 327 km from its 50.0 kWh battery at an average 15.3 kWh/100 km; less at motorway speed and in the cold.