Home › Electric cars › XPENG › G9 RWD Standard Range
XPENG G9 RWD Standard Range charging cost and time
The XPENG G9 RWD Standard Range goes about 395 km on its 75.8 kWh battery. A full charge from empty costs 409 TL at home; 10% to 80% at the cheapest DC network costs 608 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 409 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 608 TL | 482 TL | |
| 675 TL | — | |
| 692 TL | 518 TL | |
| 692 TL | 547 TL | |
| 715 TL | 634 TL | |
| 738 TL | 576 TL | |
| 744 TL | 571 TL | |
| 749 TL | 600 TL |
Cost per 100 km
| Charging at home | 104 TL |
| DC station, Sharz.net | 220 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 1 h 4 min |
| 150 kW charger | 21 min |
| 300 kW charger | 14 min |
Other XPENG models
- G6 AWD Performance
- G6 RWD Long Range
- G6 RWD Standard Range
- G9 AWD Performance
- G9 RWD Long Range
- P5
- P7 AWD Performance
- P7 RWD Long Range
- P7 Wing Edition
Frequently asked questions
How much does a full charge of the XPENG G9 RWD Standard Range cost?
On the residential tariff, a full charge from empty costs about 409 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 608 TL.
How long does the XPENG G9 RWD Standard Range take to charge?
10% to 80% takes about 1 h 4 min at a 50 kW charger, 21 min at a 150 kW charger, 14 min at a 300 kW charger. The car accepts up to 260 kW DC, and the times come from its charging curve.
What does the XPENG G9 RWD Standard Range cost per 100 km?
Charged at home, 100 km costs about 104 TL; at a DC station, 220 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the XPENG G9 RWD Standard Range?
About 395 km from its 75.8 kWh battery at an average 19.2 kWh/100 km; less at motorway speed and in the cold.