şarjnekadar

HomeElectric carsTesla › Model X 75D

Tesla Model X 75D charging cost and time

The Tesla Model X 75D goes about 375 km on its 75.0 kWh battery. A full charge from empty costs 405 TL at home; 10% to 80% at the cheapest DC network costs 602 TL.

75.0 kWhBattery
~375 kmRange
140 kWPeak DC
33 min10→80%, 150 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 405 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net602 TL476 TL
Tesla Supercharger668 TL
Petrol Ofisi e-POwer684 TL513 TL
Otowatt684 TL542 TL
Otojet708 TL627 TL
CV Charging730 TL570 TL
Voltrun736 TL565 TL
Aksa Şarj741 TL593 TL

Cost per 100 km

Charging at home108 TL
DC station, Sharz.net229 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger1 h 4 min
150 kW charger33 min
Plan your route with the Model X 75D

Other Tesla models

All Tesla models

Frequently asked questions

How much does a full charge of the Tesla Model X 75D cost?

On the residential tariff, a full charge from empty costs about 405 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 602 TL.

How long does the Tesla Model X 75D take to charge?

10% to 80% takes about 1 h 4 min at a 50 kW charger, 33 min at a 150 kW charger. The car accepts up to 140 kW DC, and the times come from its charging curve.

What does the Tesla Model X 75D cost per 100 km?

Charged at home, 100 km costs about 108 TL; at a DC station, 229 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Tesla Model X 75D?

About 375 km from its 75.0 kWh battery at an average 20.0 kWh/100 km; less at motorway speed and in the cold.