Home › Electric cars › Tesla › Model X 75D
Tesla Model X 75D charging cost and time
The Tesla Model X 75D goes about 375 km on its 75.0 kWh battery. A full charge from empty costs 405 TL at home; 10% to 80% at the cheapest DC network costs 602 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 405 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 602 TL | 476 TL | |
| 668 TL | — | |
| 684 TL | 513 TL | |
| 684 TL | 542 TL | |
| 708 TL | 627 TL | |
| 730 TL | 570 TL | |
| 736 TL | 565 TL | |
| 741 TL | 593 TL |
Cost per 100 km
| Charging at home | 108 TL |
| DC station, Sharz.net | 229 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power, worked out from the car's charging curve:
| 50 kW charger | 1 h 4 min |
| 150 kW charger | 33 min |
Other Tesla models
- Model 3 Long Range Dual Motor
- Model 3 Long Range Performance
- Model 3 Long Range RWD
- Model 3 LR
- Model 3 Performance (2020)
- Model 3 Performance (2021)
- Model 3 RWD (2022)
- Model 3 RWD (2025)
- Model 3 SR+
- Model 3 Standard Range Plus
- Model 3 Standard Range Plus LFP
- Model S Dual Motor
Frequently asked questions
How much does a full charge of the Tesla Model X 75D cost?
On the residential tariff, a full charge from empty costs about 405 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 602 TL.
How long does the Tesla Model X 75D take to charge?
10% to 80% takes about 1 h 4 min at a 50 kW charger, 33 min at a 150 kW charger. The car accepts up to 140 kW DC, and the times come from its charging curve.
What does the Tesla Model X 75D cost per 100 km?
Charged at home, 100 km costs about 108 TL; at a DC station, 229 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the Tesla Model X 75D?
About 375 km from its 75.0 kWh battery at an average 20.0 kWh/100 km; less at motorway speed and in the cold.