şarjnekadar

HomeElectric carsTesla › Model X Dual Motor

Tesla Model X Dual Motor charging cost and time

The Tesla Model X Dual Motor goes about 485 km on its 95.0 kWh battery. A full charge from empty costs 513 TL at home; 10% to 80% at the cheapest DC network costs 763 TL.

95.0 kWhBattery
~485 kmRange
250 kWPeak DC
19 min10→80%, 300 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 513 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net763 TL604 TL
Tesla Supercharger846 TL
Petrol Ofisi e-POwer867 TL650 TL
Otowatt867 TL686 TL
Otojet896 TL794 TL
CV Charging924 TL722 TL
Voltrun932 TL716 TL
Aksa Şarj939 TL752 TL

Cost per 100 km

Charging at home106 TL
DC station, Sharz.net225 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger1 h 20 min
150 kW charger27 min
300 kW charger19 min
Plan your route with the Model X Dual Motor

Other Tesla models

All Tesla models

Frequently asked questions

How much does a full charge of the Tesla Model X Dual Motor cost?

On the residential tariff, a full charge from empty costs about 513 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 763 TL.

How long does the Tesla Model X Dual Motor take to charge?

10% to 80% takes about 1 h 20 min at a 50 kW charger, 27 min at a 150 kW charger, 19 min at a 300 kW charger. The car accepts up to 250 kW DC, and the times come from its charging curve.

What does the Tesla Model X Dual Motor cost per 100 km?

Charged at home, 100 km costs about 106 TL; at a DC station, 225 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Tesla Model X Dual Motor?

About 485 km from its 95.0 kWh battery at an average 19.6 kWh/100 km; less at motorway speed and in the cold.