şarjnekadar

HomeElectric carsVolvo › ES90 Single Motor

Volvo ES90 Single Motor charging cost and time

The Volvo ES90 Single Motor goes about 486 km on its 88.0 kWh battery. A full charge from empty costs 475 TL at home; 10% to 80% at the cheapest DC network costs 706 TL.

88.0 kWhBattery
~486 kmRange
300 kWPeak DC
14 min10→80%, 300 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 475 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net706 TL559 TL
Tesla Supercharger783 TL
Petrol Ofisi e-POwer803 TL602 TL
Otowatt803 TL635 TL
Otojet830 TL736 TL
CV Charging856 TL669 TL
Voltrun864 TL663 TL
Aksa Şarj870 TL696 TL

Cost per 100 km

Charging at home97.78 TL
DC station, Sharz.net208 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger1 h 14 min
150 kW charger25 min
300 kW charger14 min
Plan your route with the ES90 Single Motor

Other Volvo models

All Volvo models

Frequently asked questions

How much does a full charge of the Volvo ES90 Single Motor cost?

On the residential tariff, a full charge from empty costs about 475 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 706 TL.

How long does the Volvo ES90 Single Motor take to charge?

10% to 80% takes about 1 h 14 min at a 50 kW charger, 25 min at a 150 kW charger, 14 min at a 300 kW charger. The car accepts up to 300 kW DC, and the times come from its charging curve.

What does the Volvo ES90 Single Motor cost per 100 km?

Charged at home, 100 km costs about 97.78 TL; at a DC station, 208 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Volvo ES90 Single Motor?

About 486 km from its 88.0 kWh battery at an average 18.1 kWh/100 km; less at motorway speed and in the cold.