Home › Electric cars › BYD › Atto 2 51.1 kWh
BYD Atto 2 51.1 kWh charging cost and time
The BYD Atto 2 51.1 kWh goes about 297 km on its 51.1 kWh battery. A full charge from empty costs 276 TL at home; 10% to 80% at the cheapest DC network costs 410 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 276 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 410 TL | 325 TL | |
| 455 TL | — | |
| 466 TL | 350 TL | |
| 466 TL | 369 TL | |
| 482 TL | 427 TL | |
| 497 TL | 388 TL | |
| 502 TL | 385 TL | |
| 505 TL | 404 TL |
Cost per 100 km
| Charging at home | 92.92 TL |
| DC station, Sharz.net | 197 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power (estimated at 80% of peak power, as no charging curve is published):
| 50 kW charger | 54 min |
Other BYD models
- Atto 2 45.1 kWh
- Atto 2 64.8 kWh
- Atto 3
- Dolphin 44.9 kWh Active
- Dolphin 44.9 kWh Boost
- Dolphin 60.4 kWh
- Dolphin Surf 30 kWh
- Dolphin Surf 43.2 kWh
- Han
- Seal 61.4 kWh RWD Comfort
- Seal 82.5 kWh AWD Excellence
- Seal 82.5 kWh RWD Design
Frequently asked questions
How much does a full charge of the BYD Atto 2 51.1 kWh cost?
On the residential tariff, a full charge from empty costs about 276 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 410 TL.
How long does the BYD Atto 2 51.1 kWh take to charge?
10% to 80% takes about 54 min at a 50 kW charger. The car accepts up to 82 kW DC.
What does the BYD Atto 2 51.1 kWh cost per 100 km?
Charged at home, 100 km costs about 92.92 TL; at a DC station, 197 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the BYD Atto 2 51.1 kWh?
About 297 km from its 51.1 kWh battery at an average 17.2 kWh/100 km; less at motorway speed and in the cold.