şarjnekadar

HomeElectric carsBYD › Dolphin Surf 43.2 kWh

BYD Dolphin Surf 43.2 kWh charging cost and time

The BYD Dolphin Surf 43.2 kWh goes about 277 km on its 43.2 kWh battery. A full charge from empty costs 233 TL at home; 10% to 80% at the cheapest DC network costs 347 TL.

43.2 kWhBattery
~277 kmRange
85 kWPeak DC
45 min10→80%, 50 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 233 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net347 TL274 TL
Tesla Supercharger385 TL
Petrol Ofisi e-POwer394 TL295 TL
Otowatt394 TL312 TL
Otojet408 TL361 TL
CV Charging420 TL328 TL
Voltrun424 TL325 TL
Aksa Şarj427 TL342 TL

Cost per 100 km

Charging at home84.27 TL
DC station, Sharz.net179 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power (estimated at 80% of peak power, as no charging curve is published):

50 kW charger45 min
Plan your route with the Dolphin Surf 43.2 kWh

Other BYD models

All BYD models

Frequently asked questions

How much does a full charge of the BYD Dolphin Surf 43.2 kWh cost?

On the residential tariff, a full charge from empty costs about 233 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 347 TL.

How long does the BYD Dolphin Surf 43.2 kWh take to charge?

10% to 80% takes about 45 min at a 50 kW charger. The car accepts up to 85 kW DC.

What does the BYD Dolphin Surf 43.2 kWh cost per 100 km?

Charged at home, 100 km costs about 84.27 TL; at a DC station, 179 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the BYD Dolphin Surf 43.2 kWh?

About 277 km from its 43.2 kWh battery at an average 15.6 kWh/100 km; less at motorway speed and in the cold.