Home › Electric cars › BYD › Atto 2 64.8 kWh
BYD Atto 2 64.8 kWh charging cost and time
The BYD Atto 2 64.8 kWh goes about 372 km on its 64.8 kWh battery. A full charge from empty costs 350 TL at home; 10% to 80% at the cheapest DC network costs 520 TL.
Charging cost
On the residential tariff (4.97 TL/kWh) a full charge from empty costs 350 TL at home. What a 10% to 80% charge costs on the road, by network:
| Network | DC, 10→80% | AC, 10→80% |
|---|---|---|
| 520 TL | 412 TL | |
| 577 TL | — | |
| 591 TL | 443 TL | |
| 591 TL | 468 TL | |
| 611 TL | 542 TL | |
| 631 TL | 493 TL | |
| 636 TL | 488 TL | |
| 640 TL | 513 TL |
Cost per 100 km
| Charging at home | 94.00 TL |
| DC station, Sharz.net | 200 TL |
| Petrol car, 7.2 L/100 km | 578 TL |
| Diesel car, 6.0 L/100 km | 534 TL |
DC charging time
10% to 80%, by charger power (estimated at 80% of peak power, as no charging curve is published):
| 50 kW charger | 1 h 8 min |
| 150 kW charger | 23 min |
Other BYD models
- Atto 2 45.1 kWh
- Atto 2 51.1 kWh
- Atto 3
- Dolphin 44.9 kWh Active
- Dolphin 44.9 kWh Boost
- Dolphin 60.4 kWh
- Dolphin Surf 30 kWh
- Dolphin Surf 43.2 kWh
- Han
- Seal 61.4 kWh RWD Comfort
- Seal 82.5 kWh AWD Excellence
- Seal 82.5 kWh RWD Design
Frequently asked questions
How much does a full charge of the BYD Atto 2 64.8 kWh cost?
On the residential tariff, a full charge from empty costs about 350 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 520 TL.
How long does the BYD Atto 2 64.8 kWh take to charge?
10% to 80% takes about 1 h 8 min at a 50 kW charger, 23 min at a 150 kW charger. The car accepts up to 155 kW DC.
What does the BYD Atto 2 64.8 kWh cost per 100 km?
Charged at home, 100 km costs about 94.00 TL; at a DC station, 200 TL. The same distance in a petrol car costs about 578 TL.
What is the range of the BYD Atto 2 64.8 kWh?
About 372 km from its 64.8 kWh battery at an average 17.4 kWh/100 km; less at motorway speed and in the cold.