şarjnekadar

HomeElectric carsVolvo › EX90 Twin Motor Performance

Volvo EX90 Twin Motor Performance charging cost and time

The Volvo EX90 Twin Motor Performance goes about 450 km on its 107.0 kWh battery. A full charge from empty costs 578 TL at home; 10% to 80% at the cheapest DC network costs 859 TL.

107.0 kWhBattery
~450 kmRange
250 kWPeak DC
21 min10→80%, 300 kW

Charging cost

On the residential tariff (4.97 TL/kWh) a full charge from empty costs 578 TL at home. What a 10% to 80% charge costs on the road, by network:

NetworkDC, 10→80%AC, 10→80%
Sharz.net859 TL680 TL
Tesla Supercharger953 TL
Petrol Ofisi e-POwer976 TL732 TL
Otowatt976 TL773 TL
Otojet1,010 TL895 TL
CV Charging1,041 TL813 TL
Voltrun1,050 TL806 TL
Aksa Şarj1,058 TL847 TL

Cost per 100 km

Charging at home129 TL
DC station, Sharz.net273 TL
Petrol car, 7.2 L/100 km578 TL
Diesel car, 6.0 L/100 km534 TL

DC charging time

10% to 80%, by charger power, worked out from the car's charging curve:

50 kW charger1 h 30 min
150 kW charger30 min
300 kW charger21 min
Plan your route with the EX90 Twin Motor Performance

Other Volvo models

All Volvo models

Frequently asked questions

How much does a full charge of the Volvo EX90 Twin Motor Performance cost?

On the residential tariff, a full charge from empty costs about 578 TL at home. On the road, 10% to 80% at the cheapest DC network (Sharz.net) costs 859 TL.

How long does the Volvo EX90 Twin Motor Performance take to charge?

10% to 80% takes about 1 h 30 min at a 50 kW charger, 30 min at a 150 kW charger, 21 min at a 300 kW charger. The car accepts up to 250 kW DC, and the times come from its charging curve.

What does the Volvo EX90 Twin Motor Performance cost per 100 km?

Charged at home, 100 km costs about 129 TL; at a DC station, 273 TL. The same distance in a petrol car costs about 578 TL.

What is the range of the Volvo EX90 Twin Motor Performance?

About 450 km from its 107.0 kWh battery at an average 23.8 kWh/100 km; less at motorway speed and in the cold.